Last chance: cinema evening in the Maintalbad with great renovation!
Last chance: cinema evening in the Maintalbad with great renovation!
The Maintalbad is faced with a comprehensive renovation that is expected to be completed by 2027. According to Primavera 24 the last opening of the swimming pool took place at the end of last year. Before the start of the demolition and new construction work, however, the empty swimming pool is transformed into a unique cinema backdrop to offer the citizens a special cinema evening. This is the last opportunity to experience the Maintalbad in its current form. The technology of the bathroom will be switched off tomorrow to prepare the upcoming conversions.
The city has planned to be demolished and the new building estimated total costs of around 45 million euros. Mayor Monika Böttcher signed the building application in September last year. The goal of the new Maintalbad is to create a family pool and a sports facility for all ages in which children can learn to swim and spend families their free time. According to maintal pool.de , the new bathroom should offer both indoor and outdoor pool areas that can be operated in parallel all year round.
planned equipment and funding
The new Maintalbad will include a variety of facilities. In the indoor pool there is a swimmer pool, a paddling pool, a non -swimmer pool and a course pool. The outdoor pool is equipped with a small paddling pool, a large non -swimmer pool and jumping towers at different heights and a tube slide that can be used all year round. In addition, adventure elements such as soil prudlers and a spray park for children are planned. Particularly noteworthy is the convertible roof, which enables weather-dependent use of the indoor pool as an outdoor pool, which also contributes to saving operating costs.
The total investment costs for the new building amount to 41.5 million euros, including the demolition costs of the existing system. In order to minimize the financial burden on the city, grants of 6 million euros from the "Refurbishment of municipal institutions" and 1 million euros from the "Swim" program of the State of Hesse are planned.
meaning for the region
The renovation is necessary because the technology of the existing Maintalbad is strongly outdated and a closure threatens. A closure would significantly tighten the Situation regarding the water surface capacity in the region. Mayor Monika Böttcher emphasizes how important the new Maintalbad is for society and emphasizes the responsible use of public funds. The investments should not only strengthen the economic, but also social cohesion in the community.
The federal government also supports such projects with programs that aim at the energetic renovation of local institutions. As bmwsb are available for the energetic renovation of swimming pools in the coming years. to create sustainable and climate -neutral standards. This funding is part of a broader initiative to improve social interaction and to increase the quality of life in cities and communities.
Details | |
---|---|
Quellen |
Kommentare (0)