Construction work on the A67: Attention - full closures are waiting for drivers!

Construction work on the A67: Attention - full closures are waiting for drivers!
The Autobahn GmbH has announced extensive construction work for the regions around Darmstadt, which will affect the A67. These measures lead to full closures, which will take place both in the direction of Basel and in the direction of Cologne. The work begins on May 10, 2025 and end on June 15, 2025, whereby the closures are carried out from 9 p.m. to 5 a.m.
The reason for the extensive closures are several safety -related construction measures. The dismantling of consoles and bracing for the transfer of the A672 as well as the assembly of drainage lines and corrosion protection is carried out. These infrastructural work is crucial for traffic safety and the durability of the highway.
planned full closure
The strong traffic restrictions affect both directions and are planned as follows:
- direction of travel Basel:
- 10. May 2025 - May 11, 2025
- 11. May 2025 - May 12, 2025
- 17. May 2025 - May 18, 2025
- 18. May 2025 - May 19, 2025
- direction of travel Cologne:
- 24. May 2025 - May 25, 2025
- 25. May 2025 - May 26, 2025
- 31. May 2025 - June 1, 2025
- 1. June 2025 - June 2, 2025
- 14. June 2025 - June 15, 2025
The diversions are set up to ensure the flow of traffic during the construction work. In the direction of Cologne, the diversion takes place via the A5 to Weiterstadt, followed by the B42 to Büttelborn. For the direction of travel Basel, the detour leads from the Mönchhof triangle to the A3 to the Frankfurter Kreuz and then over the A5 to the Darmstadt cross. Alternatively, the B42 to Weiterstadt and then the A3 to Darmstadt cross can be used from Büttelborn.
Current traffic situation on the A67
Already now there are several reports on temporary impairments on the A67. Various obstacles were eliminated on May 6, 2025. Disorders such as unsecured accident sites have been canceled and the streets are released again. These messages are important to keep the traffic situation up to date and to offer the drivers in good time.
The A67 between Mannheim and Darmstadt will also be affected by construction measures in various sections. In the past, there have been several traffic disorders, which are now canceled. This is another indication that the traffic conditions in the region are subject to constant changes and that good planning for the coming weeks is essential. Drivers should pay attention to traffic reports on radio and plan additional time for diversions.
Overall, the situation on the motorways around Darmstadt is tense, but well organized. The announced construction measures are part of the necessary infrastructural measures that will help improve traffic safety. Early in the period affected, early planning ensures that traffic jams and delays can be minimized as possible.
For further details on the current traffic reports and the situation on the A67, interested parties can be the page of stau.info provides comprehensive information on the current conditions on the A67. You can find more about the structural changes and their time frames on Autobahn.de .
Details | |
---|---|
Quellen |