Villemombler Straße: Part closure from February - important changes for buses!

Villemombler Straße: Part closure from February - important changes for buses!
From Monday, February 3, 2025, Villemombler Straße in Bonn will only be accessible as a one -way street towards Duisdorf Bahnhof due to bridge construction work. This is part of a comprehensive and necessary new building of a bridge structure on the A565, which takes place at Villemombler Straße. The old bridge, which was put into operation in 1966, has considerable corrosion damage to the tensioning steel and is in such a bad condition that a replacement has to be rebuilt as
The bridge is not only renovated in terms of structure, but also the road drainage is extensively rebuilt. This is necessary to improve the drainage conditions of the federal highway and Villemombler Straße. In the direction of Siegburg, two lanes and a hard shoulder are provided. Direction of travel Koblenz receives a three -lane directional lane with two lanes and an additional strip for uphill. These measures are part of a multi-year project, the first construction phase of which started in January 2025 and will continue until February 2025, as in Bonn moves described. As a result of the partial blocking, passengers of bus line 605 must also expect changes. The buses towards Bernhardkirche change their route from the “Köslinstrasse” stop. This is led over the Fontainegraben, Julius-Leber-Straße and the “Lengsdorf Church” stop on the church book. After "Lengsdorf Church", the buses continue their regular line path. The direction of travel towards Duisdorf Bahnhof remains unaffected by the construction work. In addition, some stops are relocated: The “Agency for Labor” stop is postponed to the “Edith Stein facility” and the “In the Grähr” stop to the “Lengsdorf Church”. The stops on the detour-including the "Goerdelerstraße", "Geschwister-Scholl-Straße", "Auf der Kirchbüchel" and "An der Brickeni"-cannot be served due to the short journey. The project is designed for about three years and provides for several construction phases. In addition to the measures already mentioned, a make -up bypass is set up in order to maintain traffic flows during the construction period. This should ensure that the number of lanes will remain available as before, in particular by using a makeshift bridge on the Duisdorf side of the A565. The need for this extensive work underlines the importance of the infrastructure in Bonn. The safe and effective traffic routing is crucial for residents and commuters. The construction work is part of a number of similar infrastructural projects that aim to ensure the longevity and safety of the traffic routes in the region, with new techniques and approaches to the fore again and again. The discussions about innovative solutions, such as the use of modern materials in conjunction with efficient construction processes, are of central importance in the civil engineering, as various specialist articles in the October edition of the civil engineer show, including topics for integrated project processing. detours and changes to the stop
long -term perspectives
Details | |
---|---|
Quellen |