Drinking water connections in Ebertsheimer Straße: closures announced!

Am 12.03.2025 werden 13 Trinkwasseranschlüsse in der Ebertsheimer Straße erneuert, was zu Sperrungen im Ortskern von Kerzenheim führt.
On March 12, 2025, 13 drinking water connections in Ebertsheimer Straße will be renewed, which leads to closures in the town center of Kerzenheim. (Symbolbild/ANAG)

Drinking water connections in Ebertsheimer Straße: closures announced!

The municipality of Cerzenheim faces significant changes. A total of 13 drinking water connections will be renewed on Ebertsheimer Strasse. These construction work, which is responsible for the waterworks of the municipality of Eisenberg, bring numerous closures and restrictions for the residents, especially for the residents of the eastern part of the old town center.

The measure is part of comprehensive infrastructural adjustments that are necessary to ensure the drinking water supply in the region. Residents have to adapt to temporary inconvenience while the work is progressing.

important drainage aspects

In connection with these construction work, the careful planning of the drainage systems is also important. The baustoffwissen.de emphasizes that the avoidance of aquaplaning and flooding for ensuring traffic safety is central.

The drainage on streets with natural gradients is via point drainage that are connected to road drains at the lowest points. On the other hand, line drainage is used on flat roads that can include underground drainage channels or curb. Upper ground troughs and trenches also play a role in the effective derivation of rainwater.

technical challenges in the settlement water industry

The settlement water management in Germany is also faced with a wide range of challenges. According to Difu a discussion about the flexibility of existing technical systems and organizational structures. In view of the changing framework conditions, the implementation of new infrastructures, including the fabric power separation and energetic use of the waste water, is becoming more and more the focus.

Crucial questions in this context are, for example, under which conditions innovative water infrastructures offer advantages and how their planning and implementation can be effectively designed in various spatial and technical contexts. Research projects, such as the "Networks 3" association, aim to address these challenges through a comprehensive potential assessment.

The coming weeks in Candy Home promise to become a time of change for both the residents and those responsible. So that the new infrastructures remain stable in the long run, such measures are essential.

Details
Quellen